HPIES’ specialist engineers fast tracked the design,
manufacture and installation to result in a project timeline
of just 3 months from initial survey to final commissioning
of both units.
Gas Turbine Direct Replacement (RDU) Control System Upgrade Case Study
Case Studies
Post